RECENT Projects
From concept to creation
2023
All Revit / BIM360 / BIM Deliverables
2023
All Revit / BIM360 / BIM Deliverables
2023
All Revit / BIM360 / BIM Deliverables
(All IDC projects are confidential, names are removed)
- 30 Storey Residential Tower, DD Stage
- 4 Storey Residential Building, DD Stage
- Heritage Building model build
- Consulting services to establish an offshore architectural delivery centre from scratch
- Consulting services to improve strategic effectiveness and operational efficiency for an offshore design practice
- Consulting services to introduce technical training, QMS systems, career development for an offshore delivery centre
- Consulting services to develop and introduce automation in architectural modelling and drawing production for an offshore delivery centre

2022
All Revit / BIM360 / BIM Deliverables
(All IDC projects are confidential, names are removed)
- $6m Rail Infrastructure Facility Urban Screen
- $30m Public Realm Waterproofing
- $120m 17 Storey Student Accommodation
- $100m 15 Storey Student Accommodation
- 37 Warehouses on single site
- $60m Interior Design Project
- $40M Interior Design Project
- $250m Inner City Redevelopment
- Strategic consulting services to offshore international delivery centre
- Consulting services to establish an offshore architectural delivery centre from scratch
- Consulting services to improve strategic effectiveness and operational efficiency for an offshore design practice
- Consulting services to develop digital and as-built services and teams within an offshore delivery centre including overseeing recruitment at director level
- Consulting services to Vietnam AEC industry for BIM adoption in construction.
Our Projects
- BIM Audit of design consultants architectural and engineering design models against the project BEP
- 2021, Revit
- Clash detection of the consultant design models for the contractor prior to engagement
- Scan-to-BIM for 19 existing campus buildings, all disciplines, internal and external. 2020, Revit.
- Construction Documentation stage documentation team leader. 2020, Revit.
- Coles supermarket Fitout Construction Documentation stage team leader. 2021, Revit
- 10 office tower buildings for owner in 4 different S.E Asian countries.
- All disciplines, asset tagging.
- The entire building including façade and subterranean infrastructure.
- 2021, Revit.
- 2-year programme including creation of all BIM standards and implementation into live projects.
- Workshops for owner team, consultant team, contractors and FM consultant.
- Design Development stage team leader for architecture and engineering
- 250,000m2, 12 residential buildings, 9 storey, full air-conditioned basement under site.
- 2018, Revit.
- Design Development and Tender stage documentation team leader.
- 2016, Revit.
- Design Development stage documentation team leader.
- Tender stage documentation team leader.
- 2015-2016, ArchiCAD
- Design Development and Tender stage documentation team leader.
- 2015, Revit.
Shepherds Bay Sydney
Stage 8-9 Residential Development.
- DD/TD/CD documentation in ArchiCAD 2015, 3 apartment buildings 10 storeys.
- Design Development stage documentation team leader.
- Construction documentation stage team leader.
- 2014, Revit.
- Design Development stage documentation team leader.
- Construction documentation stage team leader.
- 2013, Revit.
- Design Development and Tender stage documentation team leader. 2010, ArchiCAD.
- Tender documentation stage team leader.
- 2013, ArchiCAD.
- Design Development stage documentation team leader.
- Tender documentation stage team leader.
- 2009, Revit.
- Design Development stage documentation team leader.
- Tender stage documentation team leader.
- 2013, Revit.
- Design Development stage documentation team leader, Shell & Core.
- Construction documentation stage team leader.
- Construction stage support for contract admin.
- 2008-2012, AutoCAD.
- Design Development stage documentation team leader.
- Construction documentation stage team leader.
- Construction stage support for contract admin.
- 2008-2012, AutoCAD.
- Design Development stage documentation team leader.
- Construction documentation stage team leader.
- Construction stage support for contract admin.
- 2008-2012, AutoCAD.
- Construction documentation stage team leader.
- 2008, AutoCAD.
- Addition of new operation theatres and ward block.
- Construction documentation stage team leader.
- 2007-2008, AutoCAD.
- Design Development and Construction Drawing Team Leader for the Roof and Entry Packages.
- 1995-1998, AutoCAD.
- 2 Years on site construction supervision.
- Over 200 Specialty Shops, Myer, Target, Coles, Woolworths, Cinema.
Treasury Hotel - Brisbane
Conversion of the circa 1900 Queensland Land. Department Building heritage listed building into a Five-Star Hotel for the Treasury Casino.
- Design Development and Construction Drawing Team Leader for the Detail Packages.
- 1992-1995, Manual Detail Drawings, AutoCAD Plans.
- 2 Years on site construction supervision for the hotel and 10-storey underground casino facilities and carpark below the park in the picture above.
- Design Development and Construction Drawing, Detail Draftsman.
- 1988-1990, Manual Drawings.
- 1 Year on site.
- Largest Single Level Retail Development in the Southern Hemisphere at the time. First themed shopping centre in Australia.
- Design Development and Construction Drawing Detail Draftsman.
- 1991-1992, Manual Drawings.
- 1 Year on site.
- Heritage listed façade, two themed amusement levels, food court, specialty shops.